Well, we haven't moved into the house yet. We have made some progress. In addition to tearing out most of the flooring, yucky toilets, and various other destruction, we removed a doorway and replaced it with a wall. It was a doorway to a bathroom from the master bedroom. I know, I know, why on earth would someone remove access to a bathroom from the master? Because the master bedroom already has a bathroom. It is small and needs work, but that is in the 5-7 year plan - major bathroom renovation. Right now, we wanted to frame in that doorway and put a new frame around the existing closet so we can use a cool old classroom door we found and make it a sliding door. More on that later. Nancy tried her hand at drywall and she did a great job!

Before: doorway to bathroom #2. (one should never say #2 after the word bathroom)
After: no doorway to bathroom...you know...
We also had the pleasure of discovering the dining room wall had been paneled and wall paper was added some time after that. We decided to rip out the paneling and replace the drywall. It was too messed up from the glue to save. Again, Nancy is on the job!
Before: messed up from glue and nails.
During: I see a bathroom in the there!
After: She really is very good at this.